 October 29, 2009
Velocity Minerals Ltd. -- Confirms Substantial High Grade Molybdenum on its Cassiar Moly Property

 
Velocity Minerals Ltd is pleased to announce that the underground workings at its Cassiar Moly property have been successfully reopened, mapped, and sampled. The workings had been blocked for many decades by ice that had to be removed. The underground workings total 965 meters in length and consist of two sections -- the main drift (697 meters) and a cross-cut (268 meters). The main drift trends N-S for approximately 60 meters then turns to W-NW for an additional 637 meters. The cross-cut trends N-NE for 268 metres from the 587 meter point of the main drift.

Under the direct supervision of consulting geologist David S. Boyer, M.Sc., R. G.., 178 chip channel samples were collected and sent to Acme Analytical Labs. in Vancouver for analysis. Acme is a full service, ISO 9002 accredited facility. Analytical work included QA/QC procedures.

The underground samples were collected across zones of mineralization, typically on the sides (ribs) of the workings. Recorded sample intervals represent the true thickness of the structures. Three zones of significant mineralization were encountered and sequentially named Zone A, Zone B, and Zone C. Zone A represents mineralization found in the cross cut, Zone B represents mineralization found in the last 110 meters of the main drift and Zone C represents what may be a previously unrecorded zone of molybdenite mineralization found in the initial 60 meters of the main drift. Results and details of these zones are summarized below.

Zone A mineralization includes the entire 268 meter length of the cross-cut and is almost certainly the extension of the zone of strong molybdenite mineralization found in Zone B (see below). Mineralization occurs as fine-grained molybdenite closely related to shear and fault structures, and as coarse grained veins and as disseminations.. Fifty four chip channel samples were collected in Zone A. Thirty six samples, totalling 20.6 meters in sample length (not continuous), assayed 0.1% Mo or higher, including, notably, sample 732979 (0.25 meters of 7.9% Mo), sample 732975 (0.5 meters of 3.5% Mo) and sample 732971 (1.0 meters of 1.1% Mo). Selected results from Zone A are shown in the table 1. Measurements are from the main drift.

Table 1 -- Select Results from Zone A
Sample No.MeterageSample Interval (m)DescriptionMo (%)
73277134.40.20Back ("roof")0.543
732774680.50Right rib0.571
732967163.50.20Left rib0.746
732971198.51.00Left rib1.067
7329752280.50Left rib3.448
7329782351.20Left rib0.623
7329792370.25Right rib7.893
7329802401.00Left rib0.906
7329862571.00Left rib0.658
7327652581.00Left rib0.760

Zone B occupies the innermost 110 meters of the main drift and comprises a number of N-NE mineralized structures, similar in style to Zone A. Eighty five chip channel samples were collected from both the left and right sides of the drift. Twenty five samples, representing 12.75 meters in total sample length (not continuous), assayed 0.1% Mo or higher. An additional 38 samples, representing 25.4 meters in total sample length, assayed 0.01% Mo or higher. Selected results from Zone B are shown in Table 2.

Table 2 -- Select Results from Zone B
Sample No.MeterageSample Interval (m)DescriptionMo (%)
7329895980.50Right rib0.268
7329936030.10Left rib0.261
7329956080.50Right rib0.218
732796632.50.50Left rib0.327
7329176390.25Right rib0.255
732913641.10.90Right rib0.219
7329246501.00Left rib0.403
732933659.40.60Right rib0.255
732934661.50.25Left rib0.582
7329376630.20Left rib0.322
7329456850.50Right rib0.517
7329466850.20Right rib0.492

Zone C comprises mineralization in a N-NE structure that occupies the first 60 meters of the main drift and appears to trend sub-parallel to that part of the drift. Several E-NE mineralized structures also cross cut this zone. Nine chip channel samples were collected from Zone C and are presented in Table 3. Three samples collected from the back ("roof") represent the N-NE structure and the six samples collected from the ribs (sides) represent crossing structures. One of the samples (732899) assayed 0.20% Mo. Measurements are from the portal.

Table 3 -- Select Results from Zone C
Sample No.MeterageSample Interval (m)DescriptionMo (%)
73289331.501.5Back0.094
73289535.501.5Back0.030
73290046.000.8Back0.137
73289228.500.5Left rib0.076
73289629.501.5Left rib0.002
73289722.000.5Right rib0.022
73289825.000.5Right rib0.037
73289437.000.5Right rib0.034
73289931.501.5Right rib0.200


The Company is encouraged by results of the underground sampling program since it appears that Zone A and Zone B may define a zone of strong molybdenite mineralization with apparent dimensions of not less than 110 meters width and 267 meters length in association with a N-NE fault system. Prospecting and geological reconnaissance of surface, combined with the underground information, strongly suggest that this N-NE fault system is part of a larger regional structure that may represent a deep feeder system for the observed mineralization. That observation is supported by projections to surface of measured mineralized structures in Zones A & B that intersect well mineralized samples collected from surface during the past field season (see press release dated 10/20/2009), and suggest that this zone could have vertical persistence of as much as 253 meters. Both the main drift and crosscut end in mineralization so that zone is open along strike and at depth. Additional areas of mineralization (Zone C and surface), alteration, and favorable geological units mapped underground and on surface, suggest that a large Molybdenum system may be present on the Cassiar Moly property. Work is continuing to better define the possible resource by combining and interpreting the available data. Details of a program of exploration work to commence early in 2010 are being finalized.

This news release has been reviewed and approved by Erik A. Ostensoe, P. Geo., Velocity's Qualified Person for purposes of its Cassiar, B. C. area projects.

Velocity Minerals Ltd. is a company dedicated to the acquisition and development of advanced or highgrade molybdenum mineral properties. Velocity presently owns the mineral rights to two molybdenum projects in northern British Columbia (Mt. Haskin and Cassiar Moly) and is actively pursuing other properties in North America and internationally.

Kenneth R. Holmes, Chairman.

The TSX has neither approved nor disapproved of the information contained herein.

Contact:

Jeremy Yaseniuk
Investor Relations
Velocity Minerals Ltd.
Telephone: (604) 689-7411
Toll Free: (866) 920-0567
Email: info@velocityminerals.com

View News Release in PDF Format:
File: http://www.velocityminerals.com/i/pdf/2009-10-29_NR.pdf
 18 KB, approx. 4 seconds at 56.6Kbps
 
 

You can view the Next News Releases item: Thu Jan 28, 2010, VELOCITY MINERALS LTD. -- Update of Activities at Mt Haskin and Cassiar Moly - Moly, Silver, Lead, Zinc Copper and Gold were all present in 2009 Drill Program.

You can view the Previous News Releases item: Tue Oct 20, 2009, Velocity Minerals Ltd. Measures 10.5 Meters of .648% Moly on Surface

You can return to the main News Releases page, or press the Back button on your browser.