Drill Intersections

Drillhole From (m) To (m) Thickness (m)^ Gold (g/t)
Uncut
Gold (g/t)
Top cut*
 
RDD-001 62.85 106.9 45.05 2.04 2.04
and 120.9 145.9 25.00 2.04 2.04
 
RDD-002 41.8 99.8 58.00 1.04 1.04
and 109.8 183.8 74.00 3.81 2.35*
including 117.8 156.8 39.00 6.88 4.11*
 
RDD-003 43.8 108.8 61.00 1.47 1.47
including 48.8 88.8 40.00 1.99 1.99
and 107.8 117.8 10 0.83 0.83
 
RDD-004 55.5 139.5 84.00 0.99 0.99
including 63.5 83.5 20.00 1.38 1.38
including 119.5 127.5 8.0 3.28 3.28
and 142.5 151.5 9.00 4.95 4.95

^ The current exploration model has not had sufficient drill testing to be able
to determine true thickness of mineralization.
* A top-cut of 40g/t was applied to an intersection in RDD-002.

Subscribe to our Email List