Kazak

Drill intersections are calculated using a 0.2 g/t gold trigger, a minimum 0.5 g/t gold composite, and a maximum of 3 metres consecutive waste.

The drill intersections disclosed here have not yet been included in a resource model and true thickness of mineralization has not yet been determined. Drill holes are designed to intersect mineralization perpendicular or close to perpendicular.

Drillhole From (m) To (m) Thickness (m) Gold (g/t)
KDD-001 No significant intercepts
 
KDD-002 No significant intercepts
 
KDD-003 17.50 22.20 4.70 0.57
 
KDD-004 27.10 36.90 9.80 1.13
 
KDD-005 72.20 85.20 13.00 1.20
including 73.20 73.20 5.00 2.24

Subscribe to our Email List