Drill intersections are calculated using a 0.2 g/t gold trigger, a minimum 0.5 g/t gold composite, and a maximum of 3 metres consecutive waste.
The drill intersections disclosed here have not yet been included in a resource model and true thickness of mineralization has not yet been determined. Drill holes are designed to intersect mineralization perpendicular or close to perpendicular.
Drillhole | From (m) | To (m) | Thickness (m) | Gold (g/t) |
---|
KDD-001 | No significant intercepts | |||
KDD-002 | No significant intercepts | |||
KDD-003 | 17.50 | 22.20 | 4.70 | 0.57 |
KDD-004 | 27.10 | 36.90 | 9.80 | 1.13 |
KDD-005 | 72.20 | 85.20 | 13.00 | 1.20 |
including | 73.20 | 73.20 | 5.00 | 2.24 |